Equipment, software complexes
As part of the Era PC of Logos-Plus (Novosibirsk):
As part of the Ecologist PC of the Integral company (Saint Petersburg):
Working specialists
Environmental Engineer – 2;
Geographer-biologist – 1;
Chemist-biologist – 1;
Engineer -economist-manager – 1.
Process Engineer - 1.
Landmark projects
1. The project:Draft standards of MPV for the atmosphere for the objects of the Kashagan field.
Customer: Ajip KKO/North Caspian Operating Company N.V.
Region of implementation: Atyrau and Mangystau regions, 2004-2020)
Results of work: The projects present the standards of the MPV from stationary sources of the Kashagan field: drilling, construction and installation work on blocks A and D, on EPC production islands and on the routes of in-field pipelines.
Emissions into the atmosphere from mobile sources providing drilling, installation, construction, as well as geophysical and other research work at various sites of the field have been determined.
Permits for emissions into the environment have been obtained.
2. The project:Projects for the development of facilities for the pilot development of the Kashagan field". (EIA and OOS Sections).
Customer: North Caspian Operating Company N.V.
Region of implementation: Atyrau and Mangystau regions, 2004-2016
Results of the work: Provision of a complete and comprehensive analysis of the possible effects of the project/further implementation of economic and other activities, justification of alternative options for the development of the Kashagan field.
3. The project:Draft standards for the air emission standards for the objects of Tengizchevroil LLP.
Customer: Tengizchevroil LLP
Region of implementation: Atyrau region, 2013-2018
The results of the work: The PDV project provides a description of all production operations polluting the atmosphere.
The nomenclature and composition of ZV is presented.
The power and volume of emissions are estimated.
Permits have been obtained for the emission of hazardous substances into the environment.
4. The project:Draft standards for the air emission standards for 2015 for the facilities of the Karachaganak oil and gas condensate field.
Customer: Karachaganak Petroleum Operating B.V.
Region of implementation: West Kazakhstan region, 2014.
The results of the work: The PDV project provides a description of all production operations that result in emissions into the atmosphere, as well as the nomenclature and composition of SV, power and volume of emissions produced.
Obtaining a permit for the emission of SV into the environment.
5. Project: Report on the inventory of greenhouse gas emissions for NCOC N.V. facilities for 2016.
Customer: North Caspian Operating Company N.V.
Region of implementation: Atyrau region, 2017.
Results of the work: Provision of information on the volumes of direct and indirect GHG emissions for decision-making and planning of the Company's activities in the field of development of the corporate GHG emissions management system and adaptation to climate change.
6. The project:The calculated sanitary protection zone of the Karachaganak oil and gas condensate field.
Customer: Karachaganak Petroleum Operating B.V.
Region of implementation: West Kazakhstan region, 2015.
Results of the work: Based on the plans for the long-term development of KNGM, the estimated sizes of a single CVD for all the Company's facilities have been determined;
A calculated assessment of the public health risk from emissions has been carried out. Based on the approved project, a decision was made to relocate people from the settlements of Berezovka and Bestau to favorable living conditions, which was carried out within two years.